The last floor to be removed came up yesterday.... the Bedroom floor. The power washing in basement will be done today. With 6 big fans going the floors should be back down to 10% moisture content by the end of the week. Then new sub flooring will go down in the bedroom, den and kitchen.
The walls will be rebuilt in basment and then it is time to insulate. We removed the plaster, (cement), on the bricks above the fireplace in the dining room. We are thinking of leaving it the natural brick. Same will be done in one room in basement. Need to get a plumber on line..... they are scarce also.
No comments:
Post a Comment