It is like a beehive of activity at the house. The plumbers have almost everything roughed in and hope to have the inspection done as early as tomorrow. The heating and a/c crew has most of the heating ductwork in and is working on the cold air returns. We will have heat in areas that had none before. Like our entry way which relied on warm air from the hallway and living room. The electricians are wiring the garage today and should have that done by tomorrow at the latest. The sheetrockers have most of the main floor taped and mudded and may start applying texture tomorrow. When dry we may be able to start painting. The carpenter and I have a plan for buillding a soffit around the ductwork. We also have a plan for installing the exhaust fans in the workroom.
Next step will be to get the floor leveled in the rest of the basement and then start installing flooring upstairs to get ready for kitchen cabinets and cabinets in the laundry room and workroom in the basement.
No comments:
Post a Comment