Things are moving forward. The carpet is installed in the bedroom. The new bed and bedroom furniture was delivered on Friday. Base moldings are in place in the rest of the bedroom area.... dressing room and hallway. Tile is installed in the bathroom. the base moldings for the bathoom and den are stained and almost varnished. I will be installing the bathroom base moldings tonight. Plumbers are back tomorrow and will begin installing fixtures. we need a toilet as all the porta-potties have been removed from the neighborhood. The electricians will be back this week to hang fixtures and finish off the outlets and switches.
Flooring will hopefully be installed in kitchen, den and rest of the bedroom area this week.