In 1961 the bids were opened for the projects to
convert Highway 83 or Second Street, (now Broadway), to a four lane road. The project to convert
Broadway to a four lane road was divided into two projects. Shultz &
Lindsay from Fargo was awarded the bid to go from Central Avenue south to the
city limits, (about where 20th Avenue is now). The cost of that
phase was $757,968.00. The north project bid was $736,513.00. this converted
Broadway to 4 lanes from the north end of the viaduct to three miles north. The
project was paid for by special assessments to all properties inside the city
limits.